Hardware Component Tests
Due to the hand-made construction of GW12s each module had to be tested carefully
LED Tests
The 3-colour led has been tested and works perfectly. The firmware to turn the leds on/off works.
User Switch Test
The user switch works, but the code to run different functions on different lengths of pushing time has not been implemented.
Voltage Regulator Tests
The voltage regulators have been tested for power output. Details can be seen below. In these tests, the 1st radio regulator was switched on, and then 5ms later, the 2nd regulator was switched on.
Factor | Value |
---|---|
Delay | 288ms |
Pre Voltage | ±4.25 |
Post Voltage | ±4.96 |
Power out | 125mW |
Factor | Value |
---|---|
Delay | 265ms |
Pre Voltage | ±4.20 |
Post Voltage | ±4.85 |
Power out | 485mW |
Further tests:
The following voltage regulator tests still need to be carried out:
- switch on radio
- transmit simple signal
Energy Tests
Current consumption needs to be measured for the different sleep and active states.
- 2012 Battery Voltage Tests
- 2012 Energy Tests
- uSD card read/write test
- Radio test
- sleep with RTC
- 0.46mA measured in the lab with pcb No. 3
- active on turn on
- 7.5mA
- active and serious necessary processing
Firmware Tests
- I2C Driver
- Radio Driver Tests
- 2012 Network Tests
Sensor Tests
These are in the GW12 Sensor Calibration pages
- 2012 Temperature Tests by Dirk